Skip to product information
User 1

Industrial Injection 99.5-02 AE Ford/Nav Powerstroke Stock Injector (#8 Cyl Long Lead Only)

SKU: INDAEPS

$393.03 CAD
Shipping calculated at checkout.

Special Order Item Delivery times depend on manufacturer fulfillment and carrier performance. Expedited shipping reflects how the order is placed with the manufacturer and does not guarantee delivery dates. However, due to FI Performance’s industry relationships, we may be able to assist with expedited processing when possible. If timing is critical, please call us before ordering at (203) 644-0712.

Industrial Injection 99.5-02 AE Ford/Nav Powerstroke Stock Injector (#8 Cyl Long Lead Only)

Things that could pair well together with what you are looking at...